Sorry it has been a little while since the last post as we have been waiting on inspections, etc. We are now finished with the drywall installation and the first coat of sheet rock for the outside of the house. They have to put 3 coats on and patch up some other areas before we can start to paint. This week we should be able to start the tile in the bathrooms and the flooring. Enjoy!